Guarulhos Airport - SP
GRU Airport
AeroGRU Consortium
2024
Under construction
Aerom leads the AeroGRU consortium, formed by the companies AEROM, HTB, FBS and TSINFRA.
The consortium is responsible for providing a 100% automated solution for passenger transportation between terminals and the Metropolitan train, in a sustainable and safe way.
Following the example of major international airports around the world, with Aeromovel technology, the public will have a comfortable and fast connection.
The system will have 4 stations and capacity to transport 2,000 users per hour in each direction. Travel and waiting time is 6 minutes.
The line has a length of 2.7 km, with stations at terminals 1, 2, and 3 of Guarulhos Airport and next to Line 13-Jade, from the São Paulo Metropolitan Train Company (CPTM).
Transport Capacity | 2,000 passengers per hour, in each direction |
Line Length | 2,700 meters |
Vehicles | 2 vehicles in operation and 1 reserve (200 passengers each) |
Stations | 4 |
Travel Time | 6 minutes |
Interval between trains | 6 minutes |
Construction Time | 24 months |