projects

Guarulhos

LOCATION

Guarulhos Airport - SP

CLIENT

GRU Airport

OPERATION AND
MAINTENANCE

AeroGRU Consortium

INAUGURATION

2024

STATUS

Under construction

A 100% AUTOMATED SOLUTION FOR PASSENGER TRANSPORT

Aerom leads the AeroGRU consortium, formed by the companies AEROM, HTB, FBS and TSINFRA.

The consortium is responsible for providing a 100% automated solution for passenger transportation between terminals and the Metropolitan train, in a sustainable and safe way.

CONNECTION

Following the example of major international airports around the world, with Aeromovel technology, the public will have a comfortable and fast connection.

The system will have 4 stations and capacity to transport 2,000 users per hour in each direction. Travel and waiting time is 6 minutes.

ROUTE OF THE LINE

ROUTE OF THE LINE

The line has a length of 2.7 km, with stations at terminals 1, 2, and 3 of Guarulhos Airport and next to Line 13-Jade, from the São Paulo Metropolitan Train Company (CPTM).

SPECIFIC TABLE OF THE LINE

Transport Capacity 2,000 passengers per hour, in each direction
Line Length 2,700 meters
Vehicles 2 vehicles in operation and 1 reserve (200 passengers each)
Stations 4
Travel Time 6 minutes
Interval between trains 6 minutes
Construction Time 24 months